S.C.R. WAGON WORK SHOP, GUNTUPALLI

          DEGREASING PLANT FOR CONES
     

Preventive maintenance schedules of the de-greasing plant

Monthly:

     1. Clean the air nozzles.
     2. Check the inlet air pressure (5 kg/ cm2).
     3. Check proper closing of the door.
     4. Check the tension of V- belts physically and tighten / replace as per requirement.

Quarterly:

     1. Check the condition of pulley and key way of the drive and driven unit.
     2. Check for any air leakages in the air pipe line system.
     3. Check the condition of ball valve and replace it if required.