     Do's:

     1. Keep the equipment near and clean.
     2. Drain out the moisture in FRL unit by operating bottom knob.
     3. Before starting the work, check the grease in drum and ensure that sufficient
        grease is available in the drum.
     4. After completion of the working shift, switch off electrical supply from main
        switch and air supply by operating the valve.
     5. Protect greasing hoses and electrical cables from physical damage.

     Dont's:

     1. Never use cotton waste to clean the greasing fixture and other greasing machine components.
     2. While the machine is not in use, do not switch on the air supply as it is likely to damage the pump.
     3. While the machine is not in use, do not actuate/press any button on the panel board.
     4. Do not allow to change the factory calibrated settings of the grease pump without consulting the
         manufacturer.
     5. Do not disconnect the Pneumatic Pipe with pressure on, if required first drain the compressed
         air by opening ball valve.